date: Mon, 2 Jun 2008 09:03:02 +0100,
group: uk.transport.london
back
Northern Line/DLR interchange at Bank
I need to get from Balham to London City Airport tomorrow morning. TfL
planner is telling me to go via London Bridge and Canning Town (two
changes).
I know there are interchange problems at Bank, but I understood the
Northern/DLR change is still possible so wouldn't Balham>Bank>London City
be better?
Ian
--
date: Mon, 2 Jun 2008 09:03:02 +0100
author: Ian F.
|
Re: Northern Line/DLR interchange at Bank
In message of Mon, 2 Jun 2008
09:03:02 in uk.transport.london, Ian F.
writes
>I need to get from Balham to London City Airport tomorrow morning. TfL
>planner is telling me to go via London Bridge and Canning Town (two
>changes).
>
>I know there are interchange problems at Bank, but I understood the
>Northern/DLR change is still possible so wouldn't Balham>Bank>London City
>be better?
There is a lack of capacity but all interchanges are currently possible.
I was speaking to a Bank/Monument C.S.A. last week and was told there
will be a split into two stations in a couple of weeks.
Car 3 or 4 on the Northbound Northern is likely to be nearest to the
exit to the DLR.
The route via London Bridge and Canning Town shows as 47-49 minutes.
DLR from Bank is 25 minutes and Balham - Bank is 21. Add 5 for the
interchange and the Journey Planner route might be "better". Given the
Jubilee is rammed between London Bridge and Canary Wharf and the
up-and-over interchanges at London Bridge, I would not follow the
Journey Planner in this case.
--
Walter Briscoe
date: Mon, 2 Jun 2008 09:59:28 +0100
author: Walter Briscoe
|
Re: Northern Line/DLR interchange at Bank
Agree - you can still change from Northern to DLR at Bank.
Depending on time of day, there may not be a direct train to LCY from
Bank. But it's a simple same platform connection at Westferry if you
do need to change.
date: Mon, 2 Jun 2008 02:05:53 -0700 (PDT)
author: unknown
|
Re: Northern Line/DLR interchange at Bank
On 2 Jun, 09:59, Walter Briscoe wrote:
> There is a lack of capacity but all interchanges are currently possible.
> I was speaking to a Bank/Monument C.S.A. last week and was told there
> will be a split into two stations in a couple of weeks.
I was forwarded a detailed escalator works schedule given to a
passenger group, and it says one of the two Bank to Monument
escalators will be closed from September, but the other will be open
(in the up direction only) if at all possible, as otherwise Northern
Line trains have to non-stop Bank.
http://londonconnections.blogspot.com/2008/04/bank-monument-escalator-works.html
I don't think there's a scenario where the Northern-DLR interchange
gets closed, but DLR-Northern is sometimes circuitous due to the
Northern Line stairs being on the DLR departures side, and sometimes
they close the gates between the two platforms.
U
--
http://londonconnections.blogspot.com/
A blog about transport projects in London
date: Mon, 2 Jun 2008 02:43:56 -0700 (PDT)
author: Mr Thant
|
Re: Northern Line/DLR interchange at Bank
What's problem?
date: Mon, 2 Jun 2008 20:54:45 +0800
author: SS
|
Re: Northern Line/DLR interchange at Bank
"Walter Briscoe" wrote in message
news:GXKcg2QwZ7QIFwLI@freenetname.co.uk...
> The route via London Bridge and Canning Town shows as 47-49 minutes.
> DLR from Bank is 25 minutes and Balham - Bank is 21. Add 5 for the
> interchange and the Journey Planner route might be "better". Given the
> Jubilee is rammed between London Bridge and Canary Wharf and the
> up-and-over interchanges at London Bridge, I would not follow the
> Journey Planner in this case.
Many thanks Walter and the other respondents - it's Bank for me.
Ian
date: Mon, 2 Jun 2008 16:44:13 +0100
author: Ian F.
|
Re: Northern Line/DLR interchange at Bank
On 2 Jun, 10:43, Mr Thant
wrote:
> On 2 Jun, 09:59, Walter Briscoe wrote:
>
> > There is a lack of capacity but all interchanges are currently possible.
> > I was speaking to a Bank/Monument C.S.A. last week and was told there
> > will be a split into two stations in a couple of weeks.
>
> I was forwarded a detailed escalator works schedule given to a
> passenger group, and it says one of the two Bank to Monument
> escalators will be closed from September, but the other will be open
> (in the up direction only) if at all possible, as otherwise Northern
> Line trains have to non-stop Bank.
>
> http://londonconnections.blogspot.com/2008/04/bank-monument-escalator...
>
> I don't think there's a scenario where the Northern-DLR interchange
> gets closed, but DLR-Northern is sometimes circuitous due to the
> Northern Line stairs being on the DLR departures side, and sometimes
> they close the gates between the two platforms.
For some reason, they also (at busy times) barrier the entrance to the
departure platform so that from the bottom of the Northern Line stairs
you then have to go all the way to the other end of the DLR departure
platform via the area between DLR platforms. I can't work out what
that achieves. Everyone still arrives at one point, but later.
date: Tue, 3 Jun 2008 15:41:54 -0700 (PDT)
author: MIG
|
Re: Northern Line/DLR interchange at Bank
In message
of
Tue, 3 Jun 2008 15:41:54 in uk.transport.london, MIG
writes
>On 2 Jun, 10:43, Mr Thant
>wrote:
[snip]
>> I don't think there's a scenario where the Northern-DLR interchange
>> gets closed, but DLR-Northern is sometimes circuitous due to the
>> Northern Line stairs being on the DLR departures side, and sometimes
>> they close the gates between the two platforms.
>
>For some reason, they also (at busy times) barrier the entrance to the
>departure platform so that from the bottom of the Northern Line stairs
>you then have to go all the way to the other end of the DLR departure
>platform via the area between DLR platforms. I can't work out what
>that achieves. Everyone still arrives at one point, but later.
Why not ask for the reason at the Supervisors' Office/Control Room?
(It is in the Monument Ticket Hall by the Fish Street Hill entrance.)
I hit on an enthusiast answering the 'phone at 020 7222 1234.
(I had been looking for a hard copy of the Conditions of Carriage.)
I asked about the Journey Planner not routing from the Northern line to
the DLR through Bank. I was told it was the result of s software
limitation. Either Bank is an interchange or not. Partial interchange is
not supported. I could ask at
<https://www.tfl.gov.uk/tfl/contact/default.asp?type=tfl> or at
<https://www.tfl.gov.uk/tfl/contact/tube/default.asp>, but have little
confidence in the quality of answers. e.g. I have been falsely told
that: Circle and H&C carriage line diagrams show stair free access to
the street at King's Cross St Pancras; there is a Tube map on Kensal
Green's Northbound platform.
--
Walter Briscoe
date: Wed, 4 Jun 2008 08:00:55 +0100
author: Walter Briscoe
|
Re: Northern Line/DLR interchange at Bank
In message , at 08:00:55 on Wed, 4
Jun 2008, Walter Briscoe remarked:
>I have been falsely told that: Circle and H&C carriage line diagrams
>show stair free access to the street at King's Cross St Pancras; there
>is a Tube map on Kensal Green's Northbound platform.
I was looking at the Street map on the wall at the new St Pancras
western ticket hall recently, and it still shows KX-Thameslink station.
I suppose it's still available for use as an entrance to the tube lines,
but it ought to be made clearer that it's not the place to catch an FCC
train any more.
--
Roland Perry
date: Wed, 4 Jun 2008 09:23:51 +0100
author: Roland Perry
|
Re: Northern Line/DLR interchange at Bank
On 4 Jun, 08:00, Walter Briscoe wrote:
> In message
> of
> Tue, 3 Jun 2008 15:41:54 in uk.transport.london, MIG
> writes
>
> >On 2 Jun, 10:43, Mr Thant
> >wrote:
>
> [snip]
>
> >> I don't think there's a scenario where the Northern-DLR interchange
> >> gets closed, but DLR-Northern is sometimes circuitous due to the
> >> Northern Line stairs being on the DLR departures side, and sometimes
> >> they close the gates between the two platforms.
>
> >For some reason, they also (at busy times) barrier the entrance to the
> >departure platform so that from the bottom of the Northern Line stairs
> >you then have to go all the way to the other end of the DLR departure
> >platform via the area between DLR platforms. I can't work out what
> >that achieves. Everyone still arrives at one point, but later.
>
> Why not ask for the reason at the Supervisors' Office/Control Room?
> (It is in the Monument Ticket Hall by the Fish Street Hill entrance.)
My curiosity does not tempt me to miss several DLR trains in order to
go there (or maybe I should go via Canary Wharf and Westminster or
something). Anyway, why ask for information at a station whose staff
tell people to stay on the Northern to Moorgate if they want the
Central Line, despite there being an unhindered interchange at Bank?
>
> I hit on an enthusiast answering the 'phone at 020 7222 1234.
> (I had been looking for a hard copy of the Conditions of Carriage.)
> I asked about the Journey Planner not routing from the Northern line to
> the DLR through Bank. I was told it was the result of s software
> limitation. Either Bank is an interchange or not. Partial interchange is
> not supported. I could ask at
> <https://www.tfl.gov.uk/tfl/contact/default.asp?type=tfl> or at
> <https://www.tfl.gov.uk/tfl/contact/tube/default.asp>, but have little
> confidence in the quality of answers. e.g. I have been falsely told
> that: Circle and H&C carriage line diagrams show stair free access to
> the street at King's Cross St Pancras; there is a Tube map on Kensal
> Green's Northbound platform.
I recently got surveyed on the DLR and made sure to give 0 out of 10
for information at Bank and got in a rant about the lies we are being
told.
> --
> Walter Briscoe
date: Wed, 4 Jun 2008 15:27:51 -0700 (PDT)
author: MIG
|
|
|