Datacentres
Hello
Is this the right group to trawl for datacentre operators? I have nearly
racks of equipment in need of a good home - best guess is they need a 4Mb
pipe. Power consumption is estimated at around 10Amps / cabinet.
Ideal location is west of London - M3 corridor prefered.
--
William Tasso
date: Wed, 03 May 2006 15:28:50 +0100
author: William Tasso
|